11.04.2022

Addition is Almost Done


Half the trim was installed yesterday. Today the plumbers and electricians are here. Siding was dropped off in the driveway yesterday and so they should be here today. 


No more window above my kitchen sink! Although now our kitchen looks super crappy compared to the new portion. At some point we'll have to do something about it. I really want an undermount sink to be able to scrub and clean really well but also - I'm in love with butcher block, with an undermount sink that might not be possible because I really don't want mold or water damage. I may have to do some research and figure out something new to dream about. 

I still need to touch up some stain on the shelf and add a coat of polycrylic to prevent water damage and save the stain. And then do trim touch ups and fill in some nail holes. I still need to do some detail touch up in the basement from last year so I'm just going to do it all at the same time. With the kids in school, I can plan to dedicate a day to just doing this so I'm pretty excited.

We're so close to done! I'm so happy!

 

No comments: